Electrification of Ghana and Wilkins Engineering’s Involvement in Increasing the Electrification Rate
“The long term projects that we are involved in are ongoing electrification. Government in 1989 made a policy to electrify our country within 30 years. At that time the electrification rate was only 15%, today the government has reached about 72%,” says Omane Frimpong, CEO of Wilkins Engineering, Ghana’s world-class engineering company.
“The long term projects that we are involved in are ongoing electrification. Government in 1989 made a policy to electrify our country within 30 years. At that time the electrification rate was only 15%, today the government has reached about 72%,” says Omane Frimpong, CEO of Wilkins Engineering, Ghana’s world-class engineering company.
“We are not yet at 100% so that is what we are driving towards.”